PROJECT - 2017
Final project Master´s Dregree - Remodelling works of the Administration building of the University of Navarra, Pamplona, Spain.
Projecto final de estudios de Master - Reforma edificio de Administración de la Universidad de Navarra, Pamplona, España.
.
After the analysis of the current situation of the Administration building made with the Design Builder, Therm and the Blower door methods, the following deficiencies were established in it: - Thermal bridges in contact of the structure with enclosure and cover. - High energy demand for heating and cooling due to construction systems with high thermal transmittance. - High infiltration values Therefore, a series of passive measures were implemented on the ground floor of the building (perimeter greenhouse, incorporation of insulating materials), as well as a proposal on the top floor responding to a pre-established needs program, aiming to improve the energy efficiency of the current building
Tras el análsis de la situación actual del edifcio de Administración realizado con los softwares Design Builder, Therm y el método de Blower door, se establecieron las siguientes deficiencias en el mismo:
- Puentes térmicos en contacto de la estructura con cerramiento y cubierta.
- Demanda energética alta de calefacción y refrigeración debido a los sistemas constructivos con elevada transmitancia térmica.
- Valores altos de infiltración
Por ello, se limplementaron una serie de medidas pasivas en planta baja del edifcio(invernadero perimetral, incorporación de materiales aislantes) , asi como una propuesta en planta alta respondiendo a un programa de necesidades pre establecido, pretendiendo mejorar la eficiencia energética del edifcio actual